If the measures mentioned above cannot prevent a risk or solve a failure or not in time, the system operator is entitled and obliged to adjust all feed-in, transit and consumption of electricity to meet the requirements for secure and reliable operation or to request such an adjustment (§ 13 paragraph 2 EnWG in conjunction with §14 EEG). The measures described as per §13 paragraph 2 EnWG in conjunction with §14 EEG exclusively concern capacity reductions.